INSTALLATION OF PLC CABINET FOR BWT RETROFIT

Recently UniBallast has completed the full installation and electrical integration of an in house designed PLC cabinet on an oil products tanker. The installation and integration was done on-site by one of our engineers as part of a full ballast water treatment system retrofit on board the vessel.


The PLC is for controlling the valves, pumps and dosing unit of the BWT system placed on board the vessel.

Installation and commissioning of the BWT system have been successful.

Tags:
PLC CABINET INSTALLATION ELECTRICAL INTEGRATION BALLAST WATER TREATMENT SYSTEM RETROFIT UNIBALLAST